Call Number |
Title |
Author |
Date |
| I 27.2/2:H78/DOC | Geologic Report on Horsetooth Reservoir | R.L. Heaton | 2/9/43 |
| I 27. 37:73/DOC | Report of Laboratory Tests on Embankment Materials: Reservoir Dams, Colorado Big Thompson Project, Colorado | W.G. Holtz | 6/19/45 |
| I27. 37:137/DOC | Laboratory Report of Tests on The Foundation Material From The Cutoff Trench of Horsetooth Dam | H.J. Gibbs | 4/9/47 |
| I27.37:152 /DOC | Laboratory Tests for Determination Of the Placement Moisture Control Limits of Embankment Materials for The Horsetooth Reservoir Dams | H.J. Gibbs | 10/10/47 |
| I27.37:152 /DOC | Laboratory Tests for Determination Of the Placement Moisture Control Limits of Embankment Materials for The Horsetooth Reservoir Dams | H.J. Gibbs | 10/10/47 |
| I27.2/2:H78/2/DOC | Final Construction Report on Spring Canyon Dam of Horsetooth Reservoir | A.M. McClure | 5/6/49 |
| I27.2/2:H78/3/DOC | Final Construction Report on Dixon Dam of Horsetooth Reservoir | H.B. Field G.E. Hill |
6/20/49 |
| I27.2/2:H78/4/DOC | Final Construction Report on Soldier Canyon Dam of Horsetooth Reservoir | T.B. Thomas | 9/1/49 |
| I27.2/2:H78/5/DOC | Final Construction Report on Horsetooth Dam of Horsetooth Reservoir | R.B. Collins T.B. Thomas |
5/1/50 |
| I27.2/2:H78/6/DOC | Final Construction Report on Horsetooth Reservoir | C.A. Hagelin | 6/1/50 |
| I27.2/2:H78/7/ | Draft Environmental Assessment for DRAFT/DOC Dam Modifications at Horsetooth Reservoir | South Platte Projects Office | 11/83 |
| I27.2/2:H78/7/ FINAL/DOC |
Final Environmental Assessment for Dam Modifications at Horsetooth Reservoir | South Platte Projects Office | 1/84 |
| I27.2/2:H78/8/ DRAFT/DOC |
Draft Environmental Assessment for Dam Modifications at Horsetooth Reservoir | Eastern Colorado Projects Office | 10/87 |
| I27.2/2:H78/8/ FINAL/DOC |
Final Environmental Assessment for Dam Modifications at Horsetooth Reservoir | Eastern ColoradoProjects Office | 1/88 |
| I27.2/2:H78/9/DOC | Horsetooth Reservoir Dams Modification, Spec. DC-7734 | Bureau of Reclamation | 1988 |
| I27.2/2:H78/10/DOC | Final Construction Geology Report, Horsetooth Reservoir Dams Modi-Fication for Spec. DC-7734 | E.L. Wright | 5/90 |
| I27.2/2:H78/11/DOC | Final Geologic Report on the South Bay Campground Sinkholes, Horsetooth Reservoir | E.L. Wright G. Taucher |
3/91 |
| I27.2/2:H78/12/DOC | Prog. Rept. No. 3, Special Geotechnical Investigation, Horsetooth Dam | J. Swaisgood | 11/91 |
| I27.2/2:H78/13/DOC | Special Examination Report for Horsetooth Dams | R.B. Campbell | 9/25/91 (rev. 5/29/92) |
| I27.2/2:H78/14/DOC | Geologic Report, SEED Investigations, Horsetooth Dam (2 vol.) | G. Taucher L. Parish |
7/92 |
| I27.2/2:H78/15/DOC | Final Environmental Assessment for the Resource Mgt. Plans for Horsetooth Reservoir, Carter Lake, Flatiron Reservoir And Pinewood Lake | EDAW, Inc. | 8/95 |
| I27.2/2:H78/16/DOC | Resource Mgt. Plan for Horsetooth Reservoir, Carter Lake, Flatiron Reservoir and Pinewood Lake | EDAW, Inc. | 8/95 |
| I27.2/2:H78/17/DOC | Examination Report for Horsetooth Dam | J. Sharman | 9/7/95 |
| I27.2/2:H78/18DOC | Examination Report, Comprehensive Facility Review for Horsetooth Reservoir Dams | BUREC Technical Service Center | 11/96 |
| I27.2/2:H78/19/DOC | Report of Findings, Horsetooth Reservoir Dams | L.W. Davidson | 10/97 |
| I27.2/2:H78/20/DOC | Performance Parameters for Horsetooth Reservoir Dams (TM no. JT-8312-1) | PerformanceParameters Team | 10/97 |
| I27.2/2:H78/21/DOC | Consultant Review Rept. No. 1,orsetooth Dam, CO (Woodward- Clyde Project D97245) | J.W. France F.W. Swartz |
4/15/98 |
| I27.2/2:H78/22/DOC | Horsetooth Dam Seepage Issues and Related Corrective Action Alternative Study: Decision Document | Reclamation Bureau | 7/10/98 |
| I27.2/2:H78/23/DOC | Accountability Report to Independent Architect-Engineering (A-E) Consultant Review and Assessment Of Horsetooth Dam Foundation Conditions | A. Kiene | 7/98 |
| I27.2/2:H78/24/DOC | Preliminary Seismic Hazard Assessment For Rattlesnake, Flatiron, Horsetooth, Soldier Canyon, Dixon Canyon, Spring Canyon and Carter Lake Dams | U.R. Vetter | 9/98 |
| I27.2/2:H78/25-27/DOC | Horsetooth Reservoir Dams – Consequences Of a Dam Failure: Horsetooth Dam – Colorado, Loss of Life Due to Dam Failure; Spring Canyon, Dixon Canyon, Soldier Canyon Dams – Colorado, Loss of Life Due to Dam Failure; Economic Consequences Of Dam Failure and Justifiable Expenditures Safety of Dams Program, Horsetooth Dam, Colorado | B.P. Greimann E. Ekstrand |
1998/99 |
| I27.2/2:H78/28/DOC | Summary and Interpretation of Chemistry Data for Reservoir, Seeps and Groundwater From Horsetooth Dam (TM D-8290/99-001) | D. Craft | 5/99 |
| I27.2/2:H78/29/DOC | Geology and Safety of Dams Case Histories In Gypsum Karst for Horsetooth Dam and Reservoir and Carter Lake Dam no. 2 | R. Pearson | 5/27/99 |
| I27.2/2:H78/30/DOC | Crosshole Seismic Tomography and Geophysical Borehole Logging, Horsetooth Dam (TM no. D8330- 99-027) | L. Block | 11/99 |
| I27.2/2:H78/31/DOC | Horsetooth Reservoir Dams Decision Memorandum Colorado Area Office | BUREC, Eastern BUREC, Eastern | 11/10/99 |
| I27.2/2:H78/32/DOC | Report of Chemical Analyses for Water Samples from Seeps and Piezometer Holes at Horsetooth Dam (Ref. no. D8290111599.1) | D. Craft | 11/16/99 |
| I27.2/2:H78/33/DOC | Petrographic Determination of Seepage Evidence in Selected Rock Fragments (No. 8340-99-32) | D.R. Hurcomb | 12/21/99 |
| I27.2/2:H78/34/DOC | Decision Report: Horsetooth Reservoir Colorado Area Office | BUREC, Eastern | 1/12/00 |
| I27.2/2:H78/35/DOC | Consultant Review Report no. 2, Horsetooth Reservoir Dams, Colorado (URS Greiner Woodword/Clyde Proj. 68-FUSBR164.00) | URS Greiner Woodward Clyde | 2/8/00 |
| I27.2/2:H78/36/ DRAFT/DOC |
Horsetooth Reservoir, Safety of Dam Activities, Horsetooth Dam, Soldier Canyon Dam, Dixon Canyon Dam, And Spring Canyon Dam, Draft Environmental Assessment | BUREC, Eastern Colorado Area Office | 5/25/00 |
| I27.2/2:H78/36/ FINAL/DOC |
Horsetooth Reservoir, Safety of Dams Activities, Horsetooth Dam, Soldier Colorado Area Office Canyon Dam, Dixon Canyon Dam, And Spring Canyon Dam, Final Environmental Assessment and Finding Of No Significant Impact (FONSI) | BUREC, Eastern Colorado Area Office |
8/4/00 |
| I27.2/2:H78/37/DOC | Summary of 1951-1998 Chemistry and Petrography Data for Reservoir, Seeps, And Groundwater From Horsetooth Dam …and Report of Chemical Analyses for Water Samples, Seeps and Piezometer Holes at Horsetooth Dam… | Craft, Doug |
5/28-11/16/99 |
| I27.2/2:H78/38/DOC | Horsetooth Reservoir Dams, Materials Investigations Colorado Area Office | BUREC, EasternColorado Area Office |
[2000] |
| I27.2/2:H78/39/DOC | Horsetooth Dam Modifications, Evaluation of Roller Compacted Concrete Proposals… | Scott, Greg and others |
5/00 |
| I27.2/2:H78/40/DOC | Crosshole Seismic Velocity Measurements And Geophysical Borehole Logging for Dixon Canyon, Soldier Canyon and Spring Canyon Dams… | Schimschal, Ulrich |
5/00 |
| I27.2/2:H78/41/DOC | Probabilistic Ground Motion Evaluation For Horsetooth, Spring Canyon, Soldier Canyon and Dixon Dams, Colorado-Big Thompson Project, North-Central Colorado | Ake, Jon P. and Ute Vetter |
2/00 |
| 127.2/2:H78/42/DOC | Horsetooth, Soldier Canyon Dixon Canyon and Spring canyon dams, Colorado-Big Thompson Project, Colorado: Modification report | BUREC, Great Plains Region NEW |
8/00 |
| 127.2/2:H78/43/DOC | Consultant review report no. |
|
9/00 |
| 127.2/2:H78/44/DOC | Geophysical investigations Seismic surveys and borehole Logs, Horsetooth Dam, Colorado - Big Thompson Project |
Schimschal, Ulric NEW |
6/01 |
| 127.2/2:H78/45/DOC | Geophysical investigations Seismic refraction surveys And downhole surveys for Soldier Canyon, Dixon Canyon and Spring Canyon Dams, big Thompson Project, Colorado | Schimschal, Ulric NEW |
6/01 |