Series Descriptions
Inventory
Collection Summary |
||
| Creator: | Goslin, Ival V. | |
| Title: | Ival V. Goslin Water Resources Collection | |
| Dates: | 1907-2004 | |
| Bulk Dates: | 1960-1991 | |
| Quantity: | 92+ linear feet | |
| Identification: | WIVG | |
| Abstract: | For over 50 years, Ival V. Goslin (1911-1991) worked in water resources. This collection contains records from throughout his career. The bulk of the collection contains records from the Colorado Water Resources and Power Development Authority where Goslin served as the first Executive Director and later as a consultant. The Authority (est. 1981) has conducted water project feasibility studies and created and implemented financing programs for water and wastewater infrastructures. The collection includes considerable basic engineering, environmental, hydrologic, and economic data surrounding water planning in the 1980s. Records from Goslin's career at the Upper Colorado River Commission and Western Engineers, Inc. are also included. Common subjects are the filling of Lake Powell and the effects on Rainbow Bridge National Monument, and the recreational use of Jerry Creek Reservoirs. Materials include correspondence, newsletters, reports, legislative drafts, news clippings, speeches, books, pamphlets, slides, photographs, videos, and artifacts. | |
| Contact Information: | Water Resources Archive Archives and Special Collections Morgan Library Colorado State University Fort Collins, Colorado 80523-1019 USA Phone: 970-491-1844 Fax: 970-491-1195 Email: specialcollections@library.colostate.edu URL: http://lib.colostate.edu/archives/water/ |
|
Return to the Table of Contents
There are no access restrictions on this collection.
Not all of the material in the collection is in the public domain. Researchers are responsible for addressing copyright issues.
Return to the Table of Contents
Index Terms |
||
| This collection is indexed under the following headings in the Colorado State University Libraries online catalog. Researchers seeking materials about related subjects, persons, organizations or places should search the catalog using these headings. | ||
| Subjects: | ||
| Water resources development--Colorado. | ||
| Watersheds--Colorado. | ||
| Reservoirs--Colorado. | ||
| Dams--Colorado. | ||
| Persons: | ||
| Goslin, Ival V. | ||
| Organizations: | ||
| Colorado Water Resources and Power Development Authority. | ||
| Upper Colorado River Commission. | ||
| Western Engineers, Inc. | ||
| Places: | ||
| Cache la Poudre River Watershed (Colo.) | ||
| South Platte River Watershed (Colo. and Neb.) | ||
| Cherry Creek Reservoir Watershed (Colo.) | ||
| Clear Creek Watershed (Clear Creek County, Colo.) | ||
| Fraser River Watershed (Colo.) | ||
| Uncompahgre River Watershed (Colo.) | ||
| San Juan River Watershed (Colo.-Utah) | ||
| Blue River Watershed (Colo.) | ||
| San Luis Valley (Colo. and N.M.) | ||
| Wolford Mountain Reservoir (Colo.) | ||
| Powell, Lake (Utah and Ariz.) | ||
| Special Document Types: | ||
| Slides (photographs). | ||
| Maps. | ||
| Charts (graphic documents). | ||
| Photographs. | ||
| Artifacts. | ||
| Videotapes. | ||
| Posters. | ||
Return to the Table of Contents
Ival V. Goslin served a key role in the development of water resources in Colorado, specifically, and the Upper Colorado River basin, more broadly. He was born in Pullman, Washington, on May 7, 1911, and died in Grand Junction, Colorado, on June 15, 1991. He began his education at the University of Oregon from 1929-1930 and earned his Bachelor of Arts and Master of Arts degrees from Utah University in 1931 and 1935, respectively. Goslin attended the University of Idaho for postgraduate studies from 1940 to 1942, and, subsequently, received a Bachelor of Science in Civil Engineering in 1944 from Utah State University.
In 1939, Goslin began his career in water resources as a hydrographer for the U.S. Geological Survey, working until 1943 in Idaho and Wyoming on the Snake River and its diversion canals and tributaries. Promoted by the U.S.G.S. to Assistant Project Engineer from 1943 until 1945, Goslin conducted hydrological studies of the Bear River in Idaho, Utah, and Wyoming.
From 1946 to 1952, Goslin served as General Manager of Aberdeen-Springfield Canal Company, one of Idaho's largest irrigation companies. During this time (1948-1950), he was a member of the Snake River Compact Commission (Wyoming and Idaho) and an original member of the Columbia River Compact Commission (1950-1952). He served as Chairman of the Upper Snake River Valley Water Users Protective Association and Vice Chairman of the Snake River Committee of Nine (an advisory committee).
From 1953 through 1979, Goslin worked for the Upper Colorado River Commission in Grand Junction and Salt Lake City, serving as Assistant Chief Engineer (1953-1955), Acting Secretary (1955), and Executive Secretary (1955-1979). He was responsible for administering the Upper Colorado River Basin Compact for the States of Colorado, New Mexico, Utah, and Wyoming.
In 1963, Ival Goslin married Marcelyn Bridal. From 1979 to 1982, Goslin served as a water resources consultant for Western Engineers, Inc. He consulted on conservancy and recreational access issues for Jerry Creek Reservoirs.
For over 30 years, Goslin worked closely with Congressman Wayne N. Aspinall, who was Chairman of the House Interior Committee, as well as with other members of Congress, their staffs, and committees of Congress, in matters related to water development, land resources, and protection of the environment.
Goslin was one of the primary developers of the repayment formula and plan for the Colorado River Storage Project, using basin fund revenues in the Participating Projects Act. As a result of this work, Goslin developed extensive knowledge in complex water project funding. He was also involved in obtaining Congressional authorization and appropriations, as well as planning and development, of water projects in the Upper Colorado River Basin, including Lake Powell, Flaming Gorge, Curecanti, Fryingpan Arkansas, the Utah Project, and the Central Arizona Project.
From 1982 to 1985, Goslin served as the first Executive Director of the Colorado Water Resources and Power Development Authority. From 1985 until his death in 1991, he continued as a special consultant to the Colorado Water Resources and Power Development Authority. In this capacity he led the negotiations with members of Congress, Indian Tribes and various representatives of Colorado's water community that resulted in the Indian Water Rights Settlement and Cost Sharing Agreements for the Animas-La Plata Project.
In 1981, the Colorado Water Congress honored Ival V. Goslin with the Wayne N. Aspinall Water Leader of the Year Award. Goslin served as Chairman of the Board of Directors for the Water Resource Congress in 1981, and was a long-time member of the American Society of Civil Engineers and the American Water Works Association. He was a member of the Colorado Water Congress, the National Rifle Association, and the American Public Works Association. He was affiliated with the Masons and the Shriners.
Return to the Table of Contents
As settlers moved to Colorado in the late 1800s and early 1900s, they recognized the need to store water during times of plenty (e.g., spring runoff) for use later in the summer when water availability was not sufficient to support crops. During early settlement, many small dams and irrigation projects were financed and constructed by local irrigation companies. As people continued to settle in Colorado, the need for irrigation water grew to where the size of the water projects needed exceeded the ability of local irrigation companies to finance and construct the projects. Thus, in 1902, with creation of the forerunner of the Bureau of Reclamation, the federal government became a partner with state water leaders and local farmers in constructing water projects to store and distribute irrigation water.
The Bureau of Reclamation established a process whereby it developed the background information needed to plan and fund new water projects. This process operated until the late 1970s when President Jimmy Carter produced the water project "hit list" -- a list of projects in the planning and design stage targeted for no further federal funding.
The apparent exit of the federal government as a partner in planning and building water projects in the West concerned many water users in Colorado. There was a strong feeling that Colorado needed to continue to plan for future water projects if sufficient water was to be available to support Colorado's population and economic growth. In response to the federal government no longer funding the design and construction of water projects, the Colorado legislature created the Colorado Water Resources and Power Development Authority in 1981.
The Colorado Water Resources and Power Development Authority was created to "initiate, acquire, construct, maintain, repair, and operate projects or cause the same to be operated pursuant to a lease, sublease, or other agreement with any person or governmental agency and may issue its bonds and notes payable solely from revenues to pay the cost of such projects." The Authority used this directive by the Colorado Legislature to conduct feasibility studies on various water resource projects and basin-wide studies in the 1980s. In 1988, the Authority's statute was expanded to incorporate the funding of wastewater treatment projects by creating the Water Pollution Control Revolving Fund to make loans from Environmental Protection Agency (EPA) grants under the federal Clean Water Act of 1987. In 1989, the Authority's statute was again revised to give the Authority's Board of Directors sole responsibility for funding projects of $10 million or less. (In 1998 this was expanded to projects of $25 million or less.) In late 1989, it was clear that the Authority had changed directions from conducting water project feasibility studies to creating and implementing financing programs for water and wastewater infrastructure. The Drinking Water Revolving Fund was created in 1995 in anticipation of the re-authorization of the Safe Drinking Water Act. (The Safe Drinking Water Act was re-authorized in August 1996 and also provided EPA grants to the Authority to make loans.) As of June 2001, the Authority had executed over $695 million in loans under these programs.
In addition to the financing programs mentioned above, the Authority was heavily involved with the federal Animas-La Plata Project in southwestern Colorado. In 1985, Ival Goslin retired as executive director, but was retained as the Authority's consultant and representative to assist the State in negotiating the Agreement-in-Principle (1986) with the Colorado Ute Indian tribes, state of New Mexico, and the federal government. In addition, Goslin assisted the State in negotiating the Animas-La Plata Project cost-sharing agreement (1986) with New Mexico and the federal government. In 1989, the Authority placed $30 million in escrow to be used in constructing the Animas-La Plata Project. In December 2000, Congress approved funding for a much smaller project.
The Authority has contributed other funds to State activities. The first contribution was the funding and construction of the satellite-monitoring network in the mid-1980s. The Authority expended over $2.3 million for 160 stream gaging sites that would electronically send stream flow information via satellite to a central computer system at the Division of Water Resources. Upon the completion of these sites, the Authority donated the system to the Division of Water Resources. In addition, in 1999, the Authority contributed $2.4 million to the Species Conservation Trust Fund, a fund set up to promote the conservation of native species.
Since 1990, the Authority's mission has been to provide an economical source of capital to cities, towns, districts and counties for financing water and wastewater infrastructure.
Executive Directors:
1982-1985 - Ival V. Goslin
1985-1989 - Uli Kappus
1990-present - Daniel L. Law
Return to the Table of Contents
The Ival V. Goslin collection consists of documents dated 1907 to 2004, with the bulk of the material falling from 1960 to 1991. Most of the collection relates to Ival Goslin's career in water resources, including documents from various employers throughout his career and his involvement with water organizations. Subjects relate to water resources in the Upper Colorado River Basin region, which includes Arizona, Colorado, New Mexico, Utah, and Wyoming. The collection includes feasibility studies for potential water projects in Colorado, reports and legal papers relating to the filling of Lake Powell and the protection of Rainbow Bridge National Monument in Arizona and Utah, correspondence, memoranda, and legislative drafts regarding the Animas-La Plata Project and the Colorado Ute Indian Water Rights Settlement Act of 1988. The collection also contains documents relating to Ival's personal life and his wife, Marcelyn. A large number of slides are included in the collection, with subjects relating to his professional career and personal life. Other materials include books, news clippings, newsletters, speeches, published articles, videos, photographs, and artifacts.
Return to the Table of Contents
The materials in Series I, the original collection, were maintained in original order, grouped by project. Additional materials received were sorted and arranged into appropriate new series.
The collection consists of seven series in seventy-one boxes and various tubes and oversize boxes.
| Series I: Water project planning studies, 1907-1991 and undated | ||
Subseries A: Lemon Dam/Turkey Creek Project, 1960-1986 |
||
| Series II: Papers, speeches and seminars, 1960-1985 and undated | ||
| Series III: Professional papers, 1940-1990 and undated | ||
Subseries A: Upper Colorado River Commission, 1940-1985 and undated |
||
| Series IV: Personal papers, 1941-2000 and undated | ||
| Series V: Printed materials, 1921, 1946-1991 and undated | ||
| Series VI: Visual materials, 1937, 1952-2004 and undated | ||
Subseries A: Slides, 1952-1989 |
||
| Series VII: Artifacts, 1934-1991 and undated | ||
Return to the Table of Contents
Ival V. Goslin Water Resources Collection, Water Resources Archive, Colorado State University.
The reports, maps, data, and operational papers contained in the Goslin Collection were held by the Colorado Water Resources and Power Development Authority until November 18, 1998, when they were transferred to the Colorado Water Resources Research Institute (CWRRI). CWRRI maintained the collection until 2001 when the Colorado State University Libraries initiated development of a water archive. CWRRI transferred the collection to Morgan Library on April 26, 2001.
An additional donation to the collection was made in June 2002 by Marcelyn B. Goslin. These materials, all by Ival Goslin, were added as Series II: Papers, Speeches and Seminars. A third donation was received in July 2006 from the estate of Marcelyn Goslin. These materials were added as a portion of Series II and as Series III through VII.
The Goslin Collection arrived in a dozen large transfer cases, twenty-five map tubes and assorted oversized packages, some of the containers having lists of contents. After the transfer cases were numbered in order by date and topic, the contents of each were divided into four or five standard record center cartons.
Photocopies of the lists of contents provided worksheets for documenting the location of the contents of the transfer cases as they were divided into fifty record center cartons. Staff members itemized the contents in original order. Following the box inventory, the maps and other oversized documents that accompanied each project were examined. Oversized documents were placed in custom-made boxes.
The items forming Series II were placed in acid-free folders in chronological order. The finding aid was revised for this addition by Patricia J. Rettig in 2003.
Maps are inventoried according to their original arrangement and any accompanying original documentation. All dimensions are to the next largest complete inch. Individual maps are described as items if there are fewer than ten maps in a tube. Where there are ten or more maps per tube, each map set is described as a single group with its contents counted. Dimensions given are for the largest item in the group.
All diskettes in the collection were copied onto a compact disc by Shirley Miller of the Colorado Water Resources Research Institute during Summer 2002. The diskettes were not returned to the collection. The CD was placed in box 17, where the bulk of the diskettes had been filed.
The third donation to the Ival Goslin collection arrived in twenty-one boxes and two oversized packages. These items form Series III through VII; they were placed in acid-free folders and rehoused in record center cartons. All metal clips were replaced with archival plastic clips. When not in bulk, news clippings were photocopied. VHS tapes were placed in archival cases.
Speeches loose in boxes were removed and interfiled in Series II. Folders with similar names and similar contents were interfiled for simplicity. Duplicate records were discarded. Oversized items and artifacts were placed in custom-made boxes.
Slides were removed from slide carousels, cardboard slide boxes, and a metal slide container and rehoused in archival slide sleeves and acid-free three-ring boxes. Tourist landmark slides relating to the East Coast and Washington, D.C., were removed from the collection. Written indexes included with the slide carousels were discarded.
Photographs not included in published reports were removed from their original location and placed in archival photograph sleeves and in acid-free folders. A box of photography equipment was discarded.
Some reports have been scanned and are available on the Water Resources Archive website. In the electronic version of this document, they appear as links in context.
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Return to the Table of Contents
Note: Wording of titles may be truncated or otherwise edited for clarity without the insertion of ellipses. Supplied information is bracketed. Authored articles, maps or studies are listed in bibliographic form. Estimated pagination is preceded by an "e." Two identical copies of the same item are indicated by the phrase "2 copies" at the end of the entry, following the number of pages of each copy. Dissimilar copies of the same item are listed separately. Map dimensions are given in inches.
Series I: Water project planning studies |
|||||||||||||
| Box | Folder | ||||||||||||
| Subseries A: Lemon Dam/Turkey Creek Project. | |||||||||||||
| 1 | 1 | Lemon Dam Project. Feasibility Report. Volume I -- Main Report. 1985 November. e90pp. | |||||||||||
| 1 | 2 | Lemon Dam Project. Feasibility Report. Volume II -- Appendixes. 1985 November. e150pp. | |||||||||||
| 1 | 3 | Lemon Dam Project. Feasibility Report. Volume II -- Appendixes. 1985 December. e160pp. | |||||||||||
| 1 | 4 | Lemon Dam Project. Feasibility Report. Volume I -- Main Report. 1985 December. e80pp. | |||||||||||
| 1 | 5 | Lemon Dam Project. Feasibility Study. Plan of Study. 1984 October 12. 13pp. | |||||||||||
| 1 | 6 | Memorandum of Agreement [Blank]. Bureau of Reclamation, City of Aspen and Pitkin County, Colorado. 1984. 10pp. | |||||||||||
| 1 | 7 | Contract Between the United States of America and Florida Water Conservancy District. 1960 December 29. 32pp. | |||||||||||
| 1 | 8 | Turkey Creek Project. Snowball Creek Reservoir. Feasibility Study. 1986 June. e70pp. | |||||||||||
| 1 | 9 | Appendices C through G and Maps. e50pp. | |||||||||||
| 1 | 10 | San Luis Valley Project Map. Closed Basin Division. 1982 July. | |||||||||||
| Tube 1A | Turkey Creek maps. | ||||||||||||
| Tube 1A | Pagosa Springs, Colorado. 27x22 | ||||||||||||
| Tube 1A | Wolf Creek Pass, Colorado. 22x18 | ||||||||||||
| Tube 1A | Strawberry Lake, Colorado. 27x22 | ||||||||||||
| Tube 1A | Ward, Colorado. 27x22 | ||||||||||||
| Tube 1A | Snowball Creek Site. Overlay. 34x23 | ||||||||||||
| Tube 1A | Snowball Creek Site. Overlay. 34x23 | ||||||||||||
| Tube 1A | Echo Canyon Reservoir. 36x25 | ||||||||||||
| Tube 1A | Echo Canyon Spillway Enlargement. 36x25 | ||||||||||||
| Tube 1A | Echo Canyon Dam Spillway. 36x25 | ||||||||||||
| Subseries B: St. Vrain Basin. | |||||||||||||
| 2 | 1 | St. Vrain Feasibility Study. Final Report. Draft. e60pp. | |||||||||||
| 2 | 2 | St. Vrain Basin Reconnaissance Study. Summary Report. 1986 February. e50pp. | |||||||||||
| 2 | 3 | St. Vrain Basin Reconnaissance Study. Prepared for Colorado Water Resources and Power Development Authority [by] R. W. Beck and Associates [and] Dames and Moore. 1986 February. e300pp. VIEW | |||||||||||
| 2 | 4 | Task Memorandum 1-1. 1984 February 10. e35pp. | |||||||||||
| 2 | 5 | Task 1-1. Irrigation Management Study. 1983 January. e80pp. | |||||||||||
| 2 | 6 | Task Memorandum 1-2. 1984 April 6. e20pp. | |||||||||||
| 2 | 7 | Task Memorandum 1-3. 1984 April 6. e40pp. | |||||||||||
| 2 | 8 | Task Memorandum 1-4. c. 1984. e50pp. | |||||||||||
| 2 | 9 | Task Memorandum 1-5. 1984 January 5. 14pp. | |||||||||||
| 2 | 10 | Task Memorandum 1-6. Final Memo for Step 1. 1984 August. e140pp. | |||||||||||
| 2 | 11 | Step 1. Task Memoranda. 1984 April 17. e320pp. 2 copies | |||||||||||
| 3 | 1 | St. Vrain Basin Reconnaissance Study. Task Summary Memorandum 2-7. Appendix A -- Structural Plan Elements. 1985 February. e170pp. | |||||||||||
| 3 | 2 | St. Vrain File. Feasibility Study. Task Memorandum 2-1. Empty folder | |||||||||||
| 3 | 3 | St. Vrain File. Feasibility Study. Task Memorandum 2-2. Empty folder | |||||||||||
| 3 | 4 | St. Vrain Basin Reconnaissance Study. Task Memorandum 2-3. 1984 November. e80pp. | |||||||||||
| 3 | 5 | Task Memorandum 2-4. 1985 March 1. e60pp. | |||||||||||
| 3 | 6 | Task Memorandum 2-5. 1985 April 15. e70pp. | |||||||||||
| 3 | 7 | Task Memorandum 2-6. 1985 February 15. e40pp. | |||||||||||
| 3 | 8 | Task Summary Memorandum 2-7. Appendix A -- Structural Plan Elements. 1985 January. e150pp. | |||||||||||
| 3 | 9 | Task Summary Memorandum 2-7. Appendix A -- Structural Plan Elements. 1985 February. e180pp. | |||||||||||
| 3 | 10 | Task Summary Memorandum 2-7. Evaluation of Plan Elements. 1985 January. e40pp. | |||||||||||
| 3 | 11 | Task Summary Memorandum 2-7. Evaluation of Plan Elements. 1985 March. e50pp. | |||||||||||
| 3 | 12 | Memo and Materials for TM2-7. 1985 February 22. 12pp. | |||||||||||
| 3 | 13 | Task Summary Memorandum 2-8. 1985 March. e120pp. | |||||||||||
| 3 | 14 | Task Summary Memorandum 2-9. 1985 June. e270pp. | |||||||||||
| 3 | 15 | Task 2-10. Presentation of Preliminary Alternatives. 1985 March 5. 3pp. | |||||||||||
| 3 | 16 | St. Vrain Project Feasibility Study. Plan Formulation Work Session. 1985 February 4. e20pp. | |||||||||||
| 3 | 17 | Plan of Study for Step 2. 1985 March 1. e30pp. | |||||||||||
| 3 | 18 | Plan of Study with Supporting Documentation. 1983 October 20. e180pp | |||||||||||
| 4 | 1 | Coffintop Dam and Reservoir Project. St. Vrain and Left Hand Water Conservancy District. Progress Report. 1983 July 31. e240pp. | |||||||||||
| 4 | 2 | St. Vrain Basin Reconnaissance Study. Supporting Documentation. Quantity Takeoffs / Cost Estimates. 1986 February. e120pp. | |||||||||||
| 4 | 3 | St. Vrain Project, Step Two. 1985 March 20. e220pp. | |||||||||||
| 4 | 4 | St. Vrain Basin Reconnaissance Study Newsletters. 1984 April, November. 32pp. | |||||||||||
| 4 | 5 | Feasibility Study. North St. Vrain Storage Sites. 1979 April. e60pp. | |||||||||||
| 4 | 6 | Summary Report. Draft. 1986 January. e60pp. | |||||||||||
| 4 | 7 | Summary Report. Draft. 1985 December. e50pp. | |||||||||||
| 4 | 8 | Summary Report. Draft. 1985 November. e50pp. | |||||||||||
| 4 | 9 | Plan of Study. Exhibit B. 1983 October 20. e30pp. | |||||||||||
| 4 | 10 | Coffintop and Geer Canyon Feasibility Study. Volume I. Recommendations and Summary Report. 1981 December. e120pp. | |||||||||||
| 4 | 11 | Reconnaissance Report. St. Vrain Unit, Colorado. Longs Peak Division. Missouri River Basin Project. 1967 May. e60pp. | |||||||||||
| 4 | 12 | Annual Report. St. Vrain and Left Hand Water Conservancy District. 1981. 41pp. | |||||||||||
| 4 | 13 | Coffintop Dam and Reservoir Project. St. Vrain and Left Hand Water Conservancy District. Progress Report. 1982 July 31. e60pp. | |||||||||||
| 4 | 14 | St. Vrain Reconnaissance Study. Study Area Presentation Handouts. e40pp. | |||||||||||
| 4 | 15 | Coffintop Project. Engineering Geologic Feasibility Study. 1982 June. e40pp. | |||||||||||
| 4 | 16 | Coffintop Project. Engineering Geologic Feasibility Study. Addendum. 1982 June. 5pp. | |||||||||||
| 4 | 17 | Coffintop Project. Engineering Geologic Feasibility Study. e200pp. 2 copies | |||||||||||
| 4 | 18 | St. Vrain transparencies. e40pp. | |||||||||||
| 5 | 1 | St. Vrain and Left Hand Water Conservancy District. Summary Report. Coffintop and Geer Canyon. Volume I. Draft. 1981. e120pp. | |||||||||||
| 5 | 2 | St. Vrain and Left Hand Water Conservancy District. Coffintop Feasibility Study. Volume II. Technical Appendices. 1981. e160pp. | |||||||||||
| 5 | 3 | St. Vrain and Left Hand Water Conservancy District. Geer Canyon Feasibility Study. Volume III. Technical Appendices. 1981. e160pp. | |||||||||||
| 5 | 4 | Green Binder No. 1. Background Information. 1986. | |||||||||||
| 5 | 5 | Green Binder No. 2. Computer Diskettes. [Diskettes removed-see CD in box 17]. 1986. | |||||||||||
| 5 | 6 | Green Binder No. 3. Background Information. 1986. | |||||||||||
| 5 | 7 | Green Binder No. 4. Background Information. 1986. | |||||||||||
| 5 | 8 | Green Binder No. 5. Background Information. 1986. | |||||||||||
| Subseries C: Cache la Poudre. | |||||||||||||
| 6 | 1 | Cache la Poudre Basin Water and Hydropower Resources Management Study, Final Report, Volume I. Prepared by Harza Engineering Company and consultants. [For] Colorado Water Resources and Power Development Authority. 1987 January. e275pp. VIEW | |||||||||||
| 6 | 2 | Cache la Poudre Basin Water and Hydropower Resources Management Study, Final Report, Volume II. Prepared by Harza Engineering Company and consultants. [For] Colorado Water Resources and Power Development Authority. 1987 January. e200pp. VIEW | |||||||||||
| 6 | 3 | Wildlife Resource Studies for Cache La Poudre Basin Study Extension. 1988 October. 137pp. | |||||||||||
| 6 | 4 | Wildlife Resource Studies for Cache La Poudre Basin Study Extension. Appendices, Volume 1. 1988 October. e130pp. | |||||||||||
| 6 | 5 | Wildlife Resource Studies for Cache La Poudre Basin Study Extension. Appendices, Volume 2. 1988 October. e225pp. | |||||||||||
| 6 | 6 | Roe, Dorsey. "Regional Power Transfers and Economics" . 1985 June 18. 23pp. | |||||||||||
| 6 | 7 | Appendix B. Recreation, Aesthetics, and Land Use Report, Cache la Poudre Basin Study Extension. 1990 March. e125pp. | |||||||||||
| 7 | 1 | Cache la Poudre. Feasibility Study. Extension-Progress Report/Envirosphere. 1987-1988. e160pp. | |||||||||||
| 7 | 2 | Plan of Study. 1985 May 30. e70pp. | |||||||||||
| 7 | 3 | Plan of Study. 1987 May 28. 19pp. | |||||||||||
| 7 | 4 | Plan of Study. 1987 May 28. e70pp. | |||||||||||
| 7 | 5 | Scope of Work Phase III. 1987 January 8. 91pp. | |||||||||||
| 7 | 6 | Extension Task 11. 1988 February. 92pp. | |||||||||||
| 7 | 7 | Extension Task 13. 1988 February. e75pp. | |||||||||||
| 7 | 8 | Extension Task 14. c. 1987-1988. e50pp. | |||||||||||
| 7 | 9 | Extension Task 15. c. 1987-1988. e110pp. | |||||||||||
| 7 | 10 | Extension Task 16. 1988 April 16. e110pp. | |||||||||||
| 7 | 11 | Main Report Volume I. 1990 December. e450pp. | |||||||||||
| 8 | 1 | Cache la Poudre Project. Detailed Plan of Study. 1982 March 18. e65pp. | |||||||||||
| 8 | 2 | Northern Colorado Water Conservancy District. Annual Report. 1982. 17pp. | |||||||||||
| 8 | 3 | The Windy Gap Project. Biennial Progress and Financial Report. 1982. 17pp. | |||||||||||
| 8 | 4 | Final Report. Hydrologic Network Modeling. 1988 January. e70pp. | |||||||||||
| 8 | 5 | Appendix C. Hydrologic Network Modeling. 1987 November. e170pp. | |||||||||||
| 8 | 6 | Appendix D. Hydrologic Network Modeling. 1987 November. e60pp. | |||||||||||
| 8 | 7 | Cache la Poudre Basin Study. Summary Report. 1987 January. e180pp. | |||||||||||
| 8 | 8 | Cache la Poudre Basin Water and Hydropower Resources Management Study. Phase I Report (draft). 1986 May. e180pp. 2 copies | |||||||||||
| 8 | 9 | Cache la Poudre Extension Study. Computation Back-up. 1991 January 31. e150pp. | |||||||||||
| 8 | 10 | Computational Backup. Part II. e140pp. | |||||||||||
| 8 | 11 | Recreation, Aesthetics, and Land Use Report. Cache la Poudre Basin Study Extension. 1990 March. e150pp. | |||||||||||
| 9 | 1 | Original microfiche of Cache la Poudre Basin Study Extension appendices. e60 items | |||||||||||
| 9 | 2 | Cache la Poudre Basin Study Extension. Main Report. Volume II. 1990 December. e300pp. | |||||||||||
| 9 | 3 | Cache la Poudre River Basin. Larimer -- Weld Counties, Colorado. Volume I. Flood Hazard, Dam Safety and Flood Warning. 1981 October. e80pp. | |||||||||||
| 9 | 4 | Executive Summary. 1990 December. e60pp. | |||||||||||
| 9 | 5 | Cache la Poudre Extension -- 1983A. Conventional Hydroelectric Power. 1983. e120pp. | |||||||||||
| 9 | 6 | Cache la Poudre Extension -- 1983A. Grey Mountain Arch Dam. Horsetooth -- Grey Mtn. Conveyance Pipeline. e200pp. | |||||||||||
| 9 | 7 | Cache la Poudre Extension -- 1983A. Highway Relocations. e80pp. | |||||||||||
| 9 | 8 | Cache la Poudre Extension -- 1983A. Reservoir Routing -- Flood Control. Tailwater Rating Curve. e110pp. | |||||||||||
| 9 | 9 | Cache la Poudre Extension -- 1983A. Reformulation of Alt. Plans. e110pp. | |||||||||||
| 9 | 10 | Cache la Poudre Basin Water and Hydropower Resources Management Study. Final Report. Volume I. 1987 January. e300pp. | |||||||||||
| 9 | 11 | Application for Preliminary Permit. Cache la Poudre Water and Power Project. 1985 June. e80pp. | |||||||||||
| 10 | 1 | Cache la Poudre Basin Study Extension. Executive Summary. 1990 December. 41pp. VIEW | |||||||||||
| 10 | 2 | Cache la Poudre Basin Study Extension. Final Report. Volume I. 1990 December. e210pp. | |||||||||||
| 10 | 3 | Cache la Poudre Basin Study Extension. Final Report. Volume II. 1990 December. e130pp. | |||||||||||
| 10 | 4 | Cache la Poudre Basin Study Extension. Appendices. Volume I. 1990 December. e200pp. | |||||||||||
| 10 | 5 | Cache la Poudre Basin Study Extension. Appendices. Volume II. 1990 December. e220pp. | |||||||||||
| 10 | 6 | Cache la Poudre Basin Study Extension. Appendices. Volume III. 1990 December. e200pp. | |||||||||||
| 10 | 7 | Task 1 Summary Reports [drafts]. 1985 August-September. e120pp. | |||||||||||
| 10 | 8 | Task 1 Summary Report. Final. 1986 January. e110pp. | |||||||||||
| 11 | 1 | Cache la Poudre Basin Study Extension. Final Draft. Hydrologic Modeling. Appendixes. 1990 June. e280pp. | |||||||||||
| 11 | 2 | Grant, Marcus P., Christian J. Zier and Robert G. Rosenberg. "Supplemental Report: Cultural Resource Investigations in Stage One Areas of the Basin Study Extension, Cache la Poudre Hydroelectric Project, Larimer County, Colorado". 1988 February. e300pp. | |||||||||||
| 11 | 3 | Cache la Poudre Basin Study Extension. Final Draft. Hydrologic Modeling. 1990 June. 142pp. | |||||||||||
| 11 | 4 | Final Report. Windy Gap Delivery Study. 1987 June. 62pp. | |||||||||||
| 11 | 5 | Cache la Poudre Wild and Scenic River. Final Management Plan. 1990 March. 80pp. | |||||||||||
| 11 | 6 | Cache la Poudre Basin Water and Hydropower Resources Management Study. Task 1 Summary Report. Draft. 1985 September. e200pp. | |||||||||||
| 11 | 7 | Task 2 Summary Report. 1985 September. e140pp. 2 copies | |||||||||||
| 11 | 8 | Task 2 Summary Report. Revised sections. 1985 September 17. e20pp. | |||||||||||
| 11 | 9 | Task 2 Summary Report. Final. 1985 December. e180pp. | |||||||||||
| 11 | 10 | Task 3 Summary Report. Draft. c. 1985 December. e60pp. | |||||||||||
| 11 | 11 | Task 3 Summary Report. Draft. 1986 January 30. e180pp. | |||||||||||
| 11 | 12 | Task 3 Summary Report. Draft. 1985 November. e80pp. | |||||||||||
| 11 | 13 | Task 4 Summary Report. 1986 February. e60pp. | |||||||||||
| 12 | 1 | Cache la Poudre Basin Study. Task 4 Backup Data. 1986 April. e60pp. | |||||||||||
| 12 | 2 | Cache la Poudre Basin Water and Hydropower Resources Management Study. Task 4 Summary Report. 1986 February. e50pp. | |||||||||||
| 12 | 3 | Cache la Poudre Basin Study. Task 4 Backup Data. 1986 April. e60pp. | |||||||||||
| 12 | 4 | Executive Summary. Task 5 Summary Report on Analysis of Regional and Basinwide Supply and Demand. Draft. c. 1986. 22pp. | |||||||||||
| 12 | 5 | Executive Summary. Task 5 Summary Report on Analysis of Regional and Basinwide Supply and Demand. c. 1986. 25pp. 2 copies | |||||||||||
| 12 | 6 | Task 5 Summary Report. 1986 April. e80pp. | |||||||||||
| 12 | 7 | Task 7 Summary Report. 1986 September. e160pp. | |||||||||||
| 12 | 8 | Task 7 Summary Report. 1986 June. e150pp. | |||||||||||
| 12 | 9 | Task 8 Summary Report. Draft. 1986 August. e90pp. | |||||||||||
| 12 | 10 | Addendum to the Task 8 Summary Report. Draft. 1986 November. 30pp. | |||||||||||
| 12 | 11 | Task 8, Chapter 6 Revision. 1986 September 24. e50pp. | |||||||||||
| 12 | 12 | Task 9 Summary Report. Draft. 1986 November. e40pp. | |||||||||||
| 12 | 13 | Cache la Poudre Basin Study. Task 10b: Scope of Work. c. 1986. e40pp. | |||||||||||
| 13 | 1 | Cache la Poudre Study. Backup Computation Files. Materials not provided directly in the Task Reports and Final Report. e1000pp. 6 items | |||||||||||
| Tube 1C | Cache la Poudre Basin Study Maps. | ||||||||||||
| Tube 1C | St. Vrain Basin Study. 61x52 | ||||||||||||
| Tube 1C | Boulder County (USGS). 1980. 42x25 | ||||||||||||
| Tube 1C | Grey Mountain (topographic). 1986. 42x25 | ||||||||||||
| Tube 1C | Larimer County, Colorado (USGS). 1987. 45x37 | ||||||||||||
| Oversize 1 | [Overhead transparencies, a presentation by Harza Engineering]. 1986. 12x11. 45 pieces | ||||||||||||
| Oversize 1 | Preliminary Alternative 7. Elkhorn -- New Seaman. 40x30 | ||||||||||||
| Oversize 1 | Location of Reservoirs and Conduits, Terra Bella Irrigation District (California). 40x28 | ||||||||||||
| Oversize 1 | Cache la Poudre Basin. 40x30 | ||||||||||||
| Subseries D: Joint-Use Reservoir and Green Mountain Exchange Projects. | |||||||||||||
| 14 | 1 | Joint-Use Reservoir and Green Mountain Exchange Projects. Summary Report. 1987 April. 22pp. | |||||||||||
| 14 | 2 | Joint-Use Reservoir and Green Mountain Exchange Projects. Final Report. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation. 1987 April. e90pp. VIEW | |||||||||||
| 14 | 3 | Joint-Use Reservoir and Green Mountain Exchange Projects. Technical Appendixes. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Boyle Engineering Corporation. 1987 April. e240pp. VIEW | |||||||||||
| 14 | 4 | Joint Use Project Feasibility Study. Task Memorandum 1. 18pp. | |||||||||||
| 14 | 5 | Task 2 Data Collection Memorandum. 1985 October 22. e50pp. | |||||||||||
| 14 | 6 | Task 3 Screening Report. c. 1985. e180pp. | |||||||||||
| 14 | 7 | Task 3. Initial Screening Report. Draft. 1986 January. e280pp. | |||||||||||
| 14 | 8 | Task 3. Initial Screening Report. Draft with Addendum. 1986 March 11. e280pp. | |||||||||||
| 14 | 9 | Task 3. Initial Screening Report. Draft Originals. 1986 January. e160pp. 15 sleeves | |||||||||||
| 14 | 10 | Memorandum. Preliminary Hydrologic Analysis. Draft. 1986 August. e40pp. | |||||||||||
| 15 | 1 | Wolcott. Design Notes. e240pp. | |||||||||||
| 15 | 2 | Wolcott. Design Notes. e120pp. | |||||||||||
| 15 | 3 | Azure. Design Notes. e140pp. | |||||||||||
| 15 | 4 | Red Mountain. Design Notes. e240pp. | |||||||||||
| 15 | 5 | Wolford A. Design Notes. e240pp. | |||||||||||
| 15 | 6 | Wolford A. Design Notes. e200pp. | |||||||||||
| 16 | 1 | Una. Design Notes. e220pp. | |||||||||||
| 16 | 2 | Unit Cost Study. e25pp. | |||||||||||
| 16 | 3 | Miscellaneous Documents. Hydrology Studies for Marketing Water from Green Mountain Reservoir. e180pp. | |||||||||||
| 16 | 4 | Cultural Resources. Task 3. e60pp. | |||||||||||
| 17 | 1 | [Diskette inventory]. 7pp. | |||||||||||
| 17 | 2 | Diskettes (5.25"). Boyle Engineering Corporation. Green Mountain Project. [Removed--see CD below]. 1987 September. 9 packages | |||||||||||
| 17 | 3 | Compact disc of copied diskette files. | |||||||||||
| 18 | 1 | Blue River Documents. Oversize binder. e100pp. | |||||||||||
| 18 | 2 | Surge Analysis Data. Boyle Engineering Corporation. Green Mt. to Dillon. 1986. Oversize binder. e120pp. | |||||||||||
| 19 | 1 | Hydrologic Data. 1985-1987. Oversize binder. e320pp. | |||||||||||
| 19 | 2 | Hydroelectric Power Generation Studies. Unit Impact Study. Cultural Resource Study. 1985-1987. Oversize binder. e240pp. | |||||||||||
| 20 | 1 | Rock Creek Project. 1985-1987. e400pp. | |||||||||||
| 20 | 2 | Joint Use Feasibility Study. Task 8. 1983-1986. e240pp. | |||||||||||
| 20 | 3 | Joint Use Feasibility Study. Task 9. 1986-1987. e30pp. | |||||||||||
| 20 | 4 | Summary Report. Preliminary Hydrologic Analysis. 1986 August. e40pp. | |||||||||||
| 20 | 5 | Joint-Use Feasibility Study. Draft Summary / Final Report. Boyle Engineering. 1987 April. e400pp. | |||||||||||
| 20 | 6 | Presentation Overhead Transparencies. 1986-1987. 29 transparencies | |||||||||||
| 21 | 1 | Overhead Transparencies and Presentation Material. 1986. 9pp. 17 transparencies | |||||||||||
| 21 | 2 | Ruling of Referee Regarding Town of Breckenridge Application for Water Rights in the Blue River. District Court, Water Division No. 5, Colorado. 1985 January 31. e40pp. | |||||||||||
| 21 | 3 | Findings of Fact, Conclusions of Law and Consent Decree. Town of Breckenridge Consolidated Applications for Water Rights in the Blue River or its Tributaries. District Court, Water Division No. 5, Colorado. c. 1984. e60pp. | |||||||||||
| 21 | 4 | Report Synopsis. Colorado-Big Thompson Project. 1937 June 15. 33pp. | |||||||||||
| 21 | 5 | Iron Mountain Reservoir Project. Denver Board of Water Commissioners. 1983 June. e15pp. | |||||||||||
| 21 | 6 | Cost Update of Wolcott Reservoir Project. Denver Board of Water Commissioners. 1983 June. 10pp. | |||||||||||
| 21 | 7 | Review of Wolford Mountain Reservoir Project. Denver Board of Water Commissioners. 1983 June. e15pp. | |||||||||||
| 21 | 8 | Green Mountain Pumping Scheme. Denver Board of Water Commissioners. 1983 June. e15pp. | |||||||||||
| 21 | 9 | Draft Discussion Papers for West Slope Roundtable Members and the River District. 1984-1986. e60pp. | |||||||||||
| 21 | 10 | Joint Use Reservoir and Green Mountain Exchange Projects. Progress Report. 1986 January 15. 7pp. | |||||||||||
| 21 | 11 | Staff Recommendation of Projects for Permit Application Submission. Platte and Colorado River Storage Projects Participation Agreement. 1985 August. 28pp. | |||||||||||
| 21 | 12 | Decree and Stipulation. U.S. District Court, Colorado District. Consolidated Civil Case Numbers 2782, 5016, 5017. U.S.A. v. Northern Colorado Water Conservancy District. c. 1964. 6pp. | |||||||||||
| 21 | 13 | Agreement. Denver Water Board, Colorado River Water Conservation District and Northern Colorado Water Conservancy District. 1986. e30pp. | |||||||||||
| 21 | 14 | Supplement to Agreement of April 30, 1980 concerning the Windy Gap Project and the Azure Reservoir and Power Project. 1985 March 29. 16pp. | |||||||||||
| 21 | 15 | Operating Policy for Green Mountain Reservoir. 1983 December 22. 3pp. | |||||||||||
| 21 | 16 | Preliminary Draft. Green Mountain. Metropolitan Water Round Table EIS Task Force, EIS Coordinating Committee and Cooperating Agencies. 1984 January 17. e100pp. | |||||||||||
| 21 | 17 | Preliminary Draft. West Slope Storage. Metropolitan Water Round Table EIS Task Force, EIS Coordinating Committee and Cooperating Agencies. 1984 March 14. e50pp. | |||||||||||
| 21 | 18 | Miscellaneous Correspondence. Joint-Use Reservoir and Green Mountain Exchange. 1985-1987. e120pp. | |||||||||||
| 21 | 19 | Draft Summary Report. Joint-Use Reservoir and Green Mountain Exchange. 1987 April. e20pp. | |||||||||||
| 21 | 20 | Technical Appendixes A, B and C. Joint-Use Reservoir and Green Mountain Exchange. 1987 April. e160pp. | |||||||||||
| 21 | 21 | Draft Final Report. Joint-Use Reservoir and Green Mountain Exchange. 1987 April. e110pp. | |||||||||||
| 21 | 22 | Conveyance Facility. Design Notes, Drawings, Maps and Data. 1985-1986. e260pp. | |||||||||||
| 21 | 23 | "The Environmental Caucus Recommendations to the Denver Board of Water Commissioners Regarding Future Water Supply Scenarios." Colorado Environmental Caucus. 1986 January 16. e40pp. | |||||||||||
| 21 | 24 | Joint-Use Reservoir and Green Mountain Exchange Projects. Presentation to Board of Directors. Colorado Water Resources and Power Development Authority. 1987 June 5. 23pp. | |||||||||||
| Tube 1D | [Una Reservoir Project Presentation diagrams and maps]. 29 sheets. 36x34 | ||||||||||||
| Tube 2D | 1 | Wolcott -- Railroad at Eagle River and Alkali Creek. Denver and Rio Grande Railroad Right of Way and Track Map. Station 791 + 75 to Station 986 + 60. 112x25 | |||||||||||
| Tube 2D | 2 | [Wolcott Reservoir topographic maps]. 14 sheets. 39x32 | |||||||||||
| Tube 2D | 3 | [Wolcott Area maps and diagrams]. 10 sheets. 61x32 | |||||||||||
| Tube 2D | 4 | [USGS contour map]. State Bridge Quadrangle and Lara Creek Quadrangle. 50x40 | |||||||||||
| Tube 3D | 1 | [Una Reservoir Railroad and Road Relocation diagrams]. 4 sheets. 42x23 | |||||||||||
| Tube 3D | 2 | Una Reservoir Project Location Map, Dam and Spillway Plan. 3 sheets. 33x27 | |||||||||||
| Tube 3D | 3 | Wolford Mountain Sites. Gunnison River Basin Map. 40x36 | |||||||||||
| Tube 3D | 4 | [USGS contour map]. Leadville. 32x22 | |||||||||||
| Tube 3D | 5 | [USGS contour map]. Hinman Reservoir Quadrangle and Gunsight Pass Quadrangle. 50x40 | |||||||||||
| Tube 4D | Red Mountain. [Railroad Location map and County Road Relocation diagrams]. 4 sheets. 247x37 | ||||||||||||
| Tube 5D | Blueprints for Willow Creek Dam, Azure Project, Kremmling Reservoir, Yeoman Park Reservoir, Troublesome Creek, Haypark and Rabbit Ears De Berar Reservoir. e80 sheets. 27x19 | ||||||||||||
| Tube 6D | City of Aurora Collegiate Range Project. [Water Supply maps]. 6 sheets. 37x25 | ||||||||||||
| Tube 7D | 1 | [Wolford A presentation worksheets and topographic maps]. 22 sheets. 50x43 | |||||||||||
| Tube 7D | 2 | [USGS contour map]. Kremmling and Junction Butte, Colorado. 50x40 | |||||||||||
| Tube 8D | 1 | [Aerial blueline maps of the Azure Project]. 4 sheets. 44x37 | |||||||||||
| Tube 8D | 2 | [Transparent overlays and topographic maps]. 3 sheets. 42x28 | |||||||||||
| Tube 8D | 3 | [USGS contour map]. Gore Pass and Kremmling Quadrangles. 50x40 | |||||||||||
| Tube 8D | 4 | [Presentation diagrams]. 7 sheets. 36x25 | |||||||||||
| Tube 8D | 5 | [Azure Project topographic maps]. 4 sheets. 37x25 | |||||||||||
| Tube 9D | [Topographic maps]. Una. 13 sheets. 64x46 | ||||||||||||
| Oversize 2 | Small Water Resources Revenue Bond 1997 Series A Bonds. Offset Printing Negatives. 20x15. 69 items | ||||||||||||
| Oversize 2 | Presentation maps and data. 17x11. e50 items | ||||||||||||
| Oversize 2 | Proposed Project Schedule. Joint-Use and Green Mountain Exchange Projects [mounted chart]. 41x22. 2 copies | ||||||||||||
| Oversize 2 | Joint-Use Reservoir and Green Mountain Exchange Project. Colorado Water Resource and Power Development Authority. [Schedule]. [mounted chart]. 40x28 | ||||||||||||
| Oversize 2 | Green Mountain Reservoir to Dillon Conveyance [mounted map]. 40x32 | ||||||||||||
| Oversize 2 | Map of Study Area [mounted]. 60x41 | ||||||||||||
| Subseries E: San Luis Valley Confined Aquifer Study. | |||||||||||||
| 22 | 1 | San Luis Valley Confined Aquifer Study. Phase I. Final Report. Loose draft. 1987 August. e100pp. | |||||||||||
| 22 | 2 | San Luis Valley Confined Aquifer Study (phase I). Executive Summary. Final Report. Prepared for Colorado Water Resources and Power Development Authority [by] HRS Water Consultants, Inc. with Robert E. Moran. 1987 August. e120pp. VIEW | |||||||||||
| 22 | 3 | San Luis Valley Confined Aquifer Study (phase I). Appendices. Final Report. Prepared for Colorado Water Resources and Power Development Authority [by] HRS Water Consultants, Inc. with Robert E. Moran. 1987 August. e240pp. VIEW | |||||||||||
| 22 | 4 | Feasibility Study. Plan of Study for Phase IB. 1987 January 22. e20pp. | |||||||||||
| 22 | 5 | Feasibility Study. Interim Task 1 Report with Appendices. 1986 August 19. e120pp. | |||||||||||
| 22 | 6 | Feasibility Study. Task 2 (and Subtask 2-A). 1986. e60pp. | |||||||||||
| 22 | 7 | Feasibility Study. Interim Task 2 Report / Appendixes. 1987 April. e170pp. | |||||||||||
| 22 | 8 | Feasibility Study. Task 4. 1986 June 20. 10pp. | |||||||||||
| 22 | 9 | Feasibility Study. Task 5. 1987 June. e60pp. | |||||||||||
| 22 | 10 | Feasibility Study. Task 8 (Concluding Memorandum In-Situ). 1986. e50pp. | |||||||||||
| 22 | 11 | Reports/Permits/Studies. "Impact of Increasing Streamflow in the Rio Grande River". 1984 December. e100pp. | |||||||||||
| 23 | 1 | Reports/Permits/Studies. Water Rights Filing on the Baca Grant Ranch. 1986-1987. e70pp. | |||||||||||
| 23 | 2 | Reports/Permits/Studies. Preliminary Interpretation of Data from Well No. 1-19. 1986 December. e20pp. | |||||||||||
| 23 | 3 | San Luis Valley Project -- Colorado Closed Basin Division. Stand-Alone Photovoltaic Concentrator Array Pumping System and Portable Remote Observations of the Environment (PROBE). 1986 April. 16pp. | |||||||||||
| 23 | 4 | San Luis Valley Project -- Colorado Closed Basin Division. Facts and Concepts About the Project. 1984 August. 27pp. | |||||||||||
| 23 | 5 | San Luis Valley Project -- Colorado Closed Basin Division. Design and Planning of the Project. 1984 December. 14pp. | |||||||||||
| 23 | 6 | Cropcast Crop Report. 1985 July 12. e40pp. | |||||||||||
| 23 | 7 | Powell, William J. "Ground-Water Resources of the San Luis Valley". | |||||||||||
| 23 | 8 | U. S. Geological Survey Water-Supply Paper 1379. Washington, DC. 1958. 284pp. | |||||||||||
| 23 | 9 | Emery, Philip A. "Electric Analog Model Evaluation of a Water-Salvage Plan, San Luis Valley, South-Central Colorado." USGS Circular 14, Ground-Water Series. 1970. 11pp. | |||||||||||
| 23 | 10 | Burroughs, Richard L. "A Summary of the Geology of the San Luis Basin, Colorado - New Mexico, with Emphasis on the Geothermal Potential of the Monte Vista Graben." Colorado Geological Survey Special Publication 17. 1981. 30pp. 2 copies | |||||||||||
| 23 | 11 | Graham, L. Phil. "A Look at the Rio Grande Compact." Paper written for EA 575: Water Law. Colorado State University. 1984 April. e40pp. | |||||||||||
| 23 | 12 | Rio Grande River Compact. Article 66. 11pp. | |||||||||||
| 23 | 13 | Emery, Philip A., Eugene P. Patten, Jr., and John E. Moore. "Analog Model Study of the Hydrology of the San Luis Valley, South-Central Colorado." USGS. Colorado Water Resources Circular 29. 1975. 21pp. 2 copies | |||||||||||
| 23 | 14 | San Luis Valley Project Confined Aquifer Study Map. Colorado Water Resources Circular 29, Plate 4. | |||||||||||
| 23 | 15 | Emery, Philip A., Robert J. Snipes, John M. Dumeyer, and John M. Klein. "Water in the San Luis Valley, South-Central Colorado." USGS. Colorado Water Resources Circular 18. 1973. 25pp. 2 copies | |||||||||||
| 23 | 16 | Plan of Study. Rio Grande and Tributaries. Water Conservation / Management. 1983 March. 40pp. | |||||||||||
| 23 | 17 | Rio Grande Basin Compact Documents. c. 1937. e100pp. | |||||||||||
| 23 | 18 | "The San Luis Valley Project." Dedication Brochure. 1985 October 19. 10pp. | |||||||||||
| 23 | 19 | Emery, P.A., A.J. Boettcher, R.J. Snipes and H.J. McIntyre, Jr. "Hydrology of the San Luis Valley, South-Central Colorado." USGS Hydrologic Investigations Atlas HA-381. 1971. 2 sheets | |||||||||||
| 23 | 20 | Crouch, Thomas M. "Potentiometric Surface, 1980, and Water-Level Changes, 1969-80, in the Unconfined Valley-Fill Aquifers of the San Luis Basin, Colorado and New Mexico." USGS Hydrologic Investigations Atlas HA-683. 1985. 2 sheets | |||||||||||
| 23 | 21 | Inventory of Maps. Case No. W-3466. District Court, Water Division 3, Colorado. 2pp. plus 1 map | |||||||||||
| 23 | 22 | Inventory of Exhibits. Case No. W-3466. District Court, Water Division 3, Colorado. e40pp. | |||||||||||
| 23 | 23 | San Luis Valley Project. Southwest Region. Water and Power Resources Services. Selected References. e20pp. | |||||||||||
| 23 | 24 | Inventory of Endorsed Maps, Inventory of Endorsed Exhibits. Case No. W-3466. District Court, Water Division 3, Colorado. 14pp. | |||||||||||
| 23 | 25 | San Luis Valley Confined Aquifer Study. 674 Pacific Reporter, 2d Series. e20pp. | |||||||||||
| 24 | San Luis Valley Confined Aquifer Study. Background Documentation. 1985 November. e800pp. 6 volumes | ||||||||||||
| 25 | 1 | Overheads and presentation material. 1987. e20 pieces | |||||||||||
| 25 | 2 | Geologic Quadrangle Maps [Colorado locations]. 4 maps in separate envelopes | |||||||||||
| 25 | 3 | Emery, P.A., A.J. Boettcher, R.J. Snipes and H.J. McIntyre, Jr. "Hydrology of the San Luis Valley, South-Central Colorado." USGS Hydrologic Investigations Atlas HA-381. 1971. 2 sheets | |||||||||||
| 25 | 4 | [Miscellaneous logs]. 12 pieces | |||||||||||
| 25 | 5 | San Luis Valley Confined Aquifer Study Final Report (Phase I). Executive Summary. 1987 August. e15pp. | |||||||||||
| 25 | 6 | San Luis Valley Confined Aquifer Study (Phase I). Appendixes. 1987 August. e90pp. | |||||||||||
| 25 | 7 | San Luis Valley Confined Aquifer Study (Phase I). Submittal of Supporting Materials for Task 1 Analysis. 1986 December 9. e60pp. | |||||||||||
| 25 | 8 | Water Pumping and Transmission Cost and Analysis. PNM-EPE. Site Selection Study. Step 3e. 1975 July 21. e70pp. | |||||||||||
| 25 | 9 | San Luis Valley. Interim Task 2 and 5. Interim Task 2 and Task 5 Reports and Appendices. 1987 April-June. e400pp. | |||||||||||
| 25 | 10 | Overheads and presentation materials. 10 overheads and 7pp. | |||||||||||
| 25 | 11 | Presentation materials and overlays. c. 1987. 11x17. 25 pieces | |||||||||||
| 26 | San Luis Valley. Proj. No. 4332. Task 1. Sensitivity Logs. 11x15 computer printouts. 1 large binder plus 1 loose printout | ||||||||||||
| Tube 1E | San Luis Valley Confined Aquifer Study Maps. 6 sheets. 37x24 | ||||||||||||
| Tube 2E | San Luis Valley Confined Aquifer Study Maps. Baca Grande Ranch Water Requirements. May 7, 1986 [series index printed on first sheet]. 7 sheets. 43x34 | ||||||||||||
| Tube 3E | San Luis Valley Confined Aquifer Study Maps [overlays and offset printing negatives]. e50 pieces. 22x19 | ||||||||||||
| Oversize 3 | San Luis Valley Confined Aquifer Study Maps or Presentation Material [mounted map of study area]. 49x38 | ||||||||||||
| Subseries F: Cherry Creek Water Resources Project. | |||||||||||||
| 27 | 1 | Cherry Creek Water Resources Project. Executive Summary. Draft. 1987 October 16. e20pp. | |||||||||||
| 27 | 2 | Cherry Creek Water Resources Project. Phase I Feasibility Study. Final Report. Prepared for the Colorado Water Resources and Power Development Authority [by] Morrison-Knudsen Engineers, Inc. 1987 December. e70pp.; includes 2 topographic maps VIEW | |||||||||||
| 27 | 3 | Cherry Creek Water Resources Project. Phase I Feasibility Study. Appendixes. 1987 December. e280pp. | |||||||||||
| 27 | 4 | Cherry Creek Water Resources Project. Phase I Feasibility Study. Supporting Data. 1987 December. 3 volumes. e960pp. | |||||||||||
| 28 | 1 | Cherry Creek Water Resources Project. Phase I Feasibility Study. Plan of Study. 1986 September 19. e30pp. | |||||||||||
| 28 | 2 | Proposed Scope of Work for Feasibility Study (Phase IB). 1988 March. 8pp. | |||||||||||
| 28 | 3 | Task 1 Memorandum. 1987 January. e90pp. | |||||||||||
| 28 | 4 | Task 3 Memorandum. 1987 May. e50pp. 2 copies, 1 bound, 1 loose | |||||||||||
| 28 | 5 | Task 4 Memorandum. 1987 July. e70pp. | |||||||||||
| 28 | 6 | Task 5 Memorandum. 1987 July. e110pp. | |||||||||||
| 28 | 7 | Draft Work Plan, Pre-feasibility Study, Parker Water and Sanitation District, Parker Reservoir No. 1 Water Storage System. Project No. 5057 [includes references and news articles]. 1986 March 4. loose-leaf binder. e120pp. | |||||||||||
| 28 | 8 | Parker Water and Sanitation District, Parker, Colorado. Report on Examination. 1984 December 31. 19pp. | |||||||||||
| 28 | 9 | Parker Water and Sanitation District. Application for Water Rights, Attachments A-F. Contract for Feasibility Study [Blank]. e50pp. | |||||||||||
| 28 | 10 | Parker Water and Sanitation District. Record of Proceedings. 1986 February 12. 3pp. | |||||||||||
| 28 | 11 | Charles S. Content. "Eastern Slope Survey, Colorado. Report on Geology and Diamond Drilling of: Cherry Creek Project." U.S. Department of the Interior, Bureau of Reclamation. 1937 August. 63pp. | |||||||||||
| 28 | 12 | Preliminary Study of Future Water Supply Source Options. Parker Water and Sanitation District. 1985 December. e60pp. | |||||||||||
| 28 | 13 | Draft Work Plan, Pre-feasibility Study, Parker Water and Sanitation District. Parker Reservoir No. 1 Water Storage System. Project No. 5057. 1986 March 4. e20pp. | |||||||||||
| 28 | 14 | Master Water and Sanitary Sewer Plan. Parker Water and Sanitation District. 1985 August. e160pp. | |||||||||||
| 28 | 15 | Cherry Creek Basin Water Quality Management Master Plan (Revised 1989). 1989. e60pp. | |||||||||||
| 28 | 16 | Cherry Creek Basin Water Quality Management Master Plan. 1985 September. 47pp. | |||||||||||
| 28 | 17 | Castlewood Canyon State Park General Management Plan. 1981 March 20. 103pp. | |||||||||||
| 28 | 18 | Cherry Creek Water Resources Project Public Meeting. Agenda. [Presentation materials]. 1986 September 24. e30pp. | |||||||||||
| Tube 1F | Cherry Creek Water Resources Project Maps [USGS topographic maps]. | ||||||||||||
| Tube 1F | Front Range Urban Corridor. Sheet 1 of 3. Boulder -- Fort Collins -- Greeley Area. 1972. 36x29 | ||||||||||||
| Tube 1F | Front Range Urban Corridor. Sheet 2 of 3. Greater Denver Area. 1972. 36x29 | ||||||||||||
| Tube 1F | Front Range Urban Corridor. Sheet 3 of 3. Colorado Springs -- Castle Rock Area . 1972. 39x21 | ||||||||||||
| Tube 1F | Castle Rock South, Colo . 1965 Photorevised 1978. 27x22 | ||||||||||||
| Oversize 4 | Mounted Topographic Map [Denver and the region to the west]. 40x33 | ||||||||||||
| Oversize 4 | Cherry Creek Water Resources Project [mounted presentation poster showing project options]. 36x24 | ||||||||||||
| Subseries G: Clear Creek Project. | |||||||||||||
| 29 | 1 | Clear Creek Project. Phase I -- Feasibility Study. Summary Report. 1987 November. e30pp. | |||||||||||
| 29 | 2 | Clear Creek Project. Phase I -- Feasibility Study. Final Report. Vol. 1. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Tudor Engineering Company. 1987 November. e160pp. VIEW | |||||||||||
| 29 | 3 | Clear Creek Project. Phase I -- Feasibility Study. Final Report -- Appendixes. Volume II. 1987 November. e90pp. | |||||||||||
| 29 | 4 | Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Summary Report. 1989 June. e20pp. | |||||||||||
| 29 | 5 | Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Final Report. Prepared for Colorado Water Resources and Power Development Authority. Prepared by Tudor Engineering Company. 1989 June. e80pp. VIEW | |||||||||||
| 29 | 6 | Clear Creek Project. Phase I -- Feasibility Study. Plan of Study. 1986 July 14. e50pp. | |||||||||||
| 29 | 7 | Clear Creek Project. Phase I, Step 2 -- Feasibility Study. Plan of Study. 1988 March. e50pp. | |||||||||||
| 29 | 8 | Clear Creek Feasibility Study. Status Report. [Monthly reports]. 1986-1989. e100pp. | |||||||||||
| 29 | 9 | Phase I, Step 2 -- Feasibility Study. Final Report -- Appendixes. 1989 June. e140pp. | |||||||||||
| 29 | 10 | Phase I, Step 2 -- Feasibility Study. Final Report. 1989 June. e120pp. | |||||||||||
| 29 | 11 | Phase I Feasibility Study. Summary Memorandum No. 1 [with three earlier drafts]. 1986 December 4. e100pp. | |||||||||||
| 29 | 12 | Phase I -- Feasibility Study. Final Report -- Appendixes. Volume II. 1987 November. e120pp. | |||||||||||
| 30 | 1 | Phase I -- Feasibility Study. Summary Memorandum No. 2 [with three earlier drafts]. 1987 February 25. e240pp. | |||||||||||
| 30 | 2 | Phase I, Step 2 -- Feasibility Study. Draft. 1988 September 9. e30pp. | |||||||||||
| 30 | 3 | Phase I -- Feasibility Study. Summary Memorandum No. 3. 1986 December 23. e70pp. | |||||||||||
| 30 | 4 | Phase I -- Feasibility Study. Presentation to Colorado Water Resources and Power Development Authority. 22pp. | |||||||||||
| 30 | 5 | Phase I -- Feasibility Study. Summary Memorandum No. 3. 1987 February 20. e70pp. | |||||||||||
| 30 | 6 | Phase I -- Feasibility Study. Summary Memorandum No. 4. 1987 January 15. e50pp. | |||||||||||
| 30 | 7 | Phase I -- Feasibility Study. Summary Memorandum No. 4. 1987 March 16. e70pp. 2 copies | |||||||||||
| 30 | 8 | Phase I -- Feasibility Study. Summary Memorandum No. 5. 1987 April 13. e140pp. | |||||||||||
| 30 | 9 | Phase I -- Feasibility Study. Step 1 -- Summary Report. 1987 July 20. e40pp. 2 copies | |||||||||||
| 30 | 10 | Phase I -- Feasibility Study. Step 1 -- Summary Report. 1987 October. e40pp. | |||||||||||
| 30 | 11 | Phase I, Step 2 -- Feasibility Study. Dam Layouts and Costs. 1989 February 1. e20pp. | |||||||||||
| 30 | 12 | Phase I, Step 2 -- Feasibility Study. 1989 February 17. e30pp. | |||||||||||
| 30 | 13 | Phase I, Step 2 -- Feasibility Study. 1989 May 17. e25pp. | |||||||||||
| 30 | 14 | Burns, Kim, Lillie L. Fuller, Mark Gage, Edward Mann, and Patrick McGraw. "Clear Creek Proposed Dam Project Environmental Impact Assessment." Geog 4420/5220. Department of Urban and Regional Planning, School of Architecture and Planning, University of Colorado at Denver. 153pp. | |||||||||||
| 30 | 15 | Clear Creek Project. U.S. 6 Analysis Calculations. c. 1989. e140pp. | |||||||||||
| 30 | 16 | Record of Decision for Northeast Resource Management Plan. U.S. Department of the Interior, Bureau of Land Management. Canon City District, Colorado. Northeast Resource Area. 1986 September. e100pp. | |||||||||||
| 31 | 1 | Amendment Sheep Mountain Quarry Application. 1991 April 8. e100pp. | |||||||||||
| 31 | 2 | Izett, Glen A. and C.S. Venable Barclay. "Geologic Map of the Kremmling Quadrangle, Grand County, Colorado." USGS. 1973. | |||||||||||
| 31 | 3 | Sims, P. K. and D. J. Gable. "Geology of Precambrian Rocks, Central City District, Colorado". 1964. 52pp. plus map | |||||||||||
| 31 | 4 | Braddock, William A. "Geology of the Empire Quadrangle. Grand, Gilpin, and Clear Creek Counties, Colorado". 1969. 56pp. plus map | |||||||||||
| 31 | 5 | Clear Creek County, Colorado. 1:50 000-scale topographic map | |||||||||||
| 31 | 6 | Gilpin County, Colorado. 1:50 000-scale topographic map | |||||||||||
| 31 | 7 | Van Horn, Richard. "Superficial and Bedrock Geologic Map of the Golden Quadrangle, Jefferson County, Colorado." USGS. 1972. | |||||||||||
| 31 | 8 | Sheridan, Douglas M. and Sherman P. Marsh. "Geologic Map of the Squaw Pass Quadrangle, Clear Creek, Jefferson, and Gilpin Counties, Colorado." USGS. 1976. | |||||||||||
| 31 | 9 | Trimble, Donald E. and Michael N. Machette. "Geologic Map of the Greater Denver Area, Front Range Urban Corridor, Colorado." USGS. 1979. | |||||||||||
| 31 | 10 | Bryant, Bruce, Laura W. McGrew and Reinhard A. Wobus. "Geologic Map of the Denver 1 x 2 Quadrangle, North-Central Colorado." USGS. 1981. | |||||||||||
| 31 | 11 | Sheridan, Douglas M., John C. Reed, Jr. and Bruce Bryant. "Geologic Map of the Evergreen Quadrangle, Jefferson County, Colorado." USGS. 1972. | |||||||||||
| 31 | 12 | Taylor, Richard B. "Geologic Map of the Black Hawk Quadrangle, Gilpin, Jefferson, and Clear Creek Counties, Colorado." USGS. 1976. | |||||||||||
| 31 | 13 | Interim Report. Blue -- South Platte Project, Colorado. Appendix G -- Flood Control. U.S. Department of the Interior. 1948 June. 3pp. | |||||||||||
| 31 | 14 | Flood Plain Information Report. Metropolitan Region. Denver, Colorado. Volume III: Technical Appendix. Bear and Clear Creeks, South Platte River Basin. 1966 January. e40pp. | |||||||||||
| 31 | 15 | Flood Plain Information Report. Metropolitan Region. Denver, Colorado. Volume III: Summary Report. Bear and Clear Creeks, South Platte River Basin. 1966 January. e20pp. | |||||||||||
| 31 | 16 | Flood Insurance Study. City of Golden, Colorado. Jefferson County. c. 1983. e50pp. | |||||||||||
| 31 | 17 | Flood Insurance Study. City of Idaho Springs, Colorado. Clear Creek County. 1978 May. e20pp. | |||||||||||
| 31 | 18 | Salcedo, Tracy. "Canyon's conservation urged." The Canyon Courier. 1988 October 5. pp. 1-2 | |||||||||||
| 31 | 19 | Cantwell, Rebecca. "State studies damming of Clear Creek." Rocky Mountain News. 1988 September 4. pp. 1, 6, 17 | |||||||||||
| 31 | 20 | Armitage, Diane. "Dam proposal dammed by Gilpin residents." The Mountain-Ear. 1988 September 22. pp. 5-6 | |||||||||||
| 31 | 21 | Flood Boundary and Floodway Map. City of Idaho Springs, Colorado. Clear Creek County. | |||||||||||
| 31 | 22 | Interim Report No. 3. U.S. Highway 6 Evaluation. 1989 February 6. e30pp. | |||||||||||
| 31 | 23 | Interim Report No. 3. U.S. Highway 6 Evaluation. 1988 August 9. e25pp. | |||||||||||
| 31 | 24 | Clear Creek Project: Phase I -- Feasibility Study. Summary Report. 1987 June 9. e60pp | |||||||||||
| 31 | 25 | Analysis of the Water Quality of Clear Creek Above Golden, Colorado, and of Its Significance for Possible Future Impoundment of Clear Creek. 1986 December 15. 73pp. | |||||||||||
| 31 | 26 | Centennial Dam Site. Clear Creek Canyon, Colorado. c. 1988. 11pp. | |||||||||||
| 31 | 27 | Review of Phase 1, Step 2 -- Feasibility Study, Chapter 2. 1988 October 27. e20pp. | |||||||||||
| 31 | 28 | Topographic Map. Evergreen Quadrangle, Colorado -- Jefferson County. | |||||||||||
| 32 | 1 | Summary Report. Clear Creek Project. Phase I, Step 2 -- Feasibility Study. 1989 June. e40pp. | |||||||||||
| 32 | 2 | Clear Creek Cost Estimates. 1986 November. e120pp. | |||||||||||
| 32 | 3 | Section 7, "Geotechnical Assessment," through Section 13, "Conclusions and Recommendations". e90pp. | |||||||||||
| 32 | 4 | Clear Creek Project Formulation. e80pp. | |||||||||||
| 32 | 5 | Clear Creek Project. Volume 1 -- Step 1. Hydrology and Modeling. Back Up Information. Cheryl Signs Engineering. 1987. e220pp. | |||||||||||
| 32 | 6 | Clear Creek Study Software and Documentation Step #2. e80pp. plus diskettes. [Diskettes removed--see CD in box 17] | |||||||||||
| 32 | 7 | Clear Creek Project. U.S. Highway 6 Relocation. e40pp. | |||||||||||
| 32 | 8 | Clear Creek Project. Volume 7, Step 2. Dam Layout, Geology, Hydrology and Costs. e120pp. | |||||||||||
| 32 | 9 | Clear Creek Project [manila envelope]. Transparencies, Aerial Photos. e40 pieces | |||||||||||
| 32 | 10 | Application for Feasibility Study Funding. 1983 August. e40pp. | |||||||||||
| 32 | 11 | Overheads and presentation materials [in manila envelope]. e25 pieces | |||||||||||
| 32 | 12 | Summary Report Graphics. 5 presentation maps | |||||||||||
| 32 | 13 | Final Report Graphics. 13 presentation maps | |||||||||||
| Tube 1G | Clear Creek Project. 1989 June. e30 topographic maps. 74x37 | ||||||||||||
| Tube 2G | Clear Creek Project. 1989 June. e25 topographic maps. 38x26 | ||||||||||||
| Tube 3G | Clear Creek Project. 1989 June. e35 topographic maps. 42x30 | ||||||||||||
| Tube 4G | Clear Creek Project Blueprints. e20 topographic map overlays, including dam designs. 42x31 | ||||||||||||
| Oversize 5 | Large | ||||||||||||